Project Objectives
To provide a covered area with a full heating system and glass balustrade enclosure, and also to replace the existing timber decking with more durable composite decking.
Solution and Deliverables
We supplied the client with a Markilux Syncra system with two Markilux 5010 awnings and four Tansun Monaco 2kw infrared outdoors heaters. We chose this particular solution to give the customer the flexibility to cover either half or all the area.
The commercial awning solution designed and installed by Duckworth Outdoor Solutions has given The Albion a fantastic outdoor area that enables them to serve customers outside with their dogs on windy and wet days.
Project Timeframe
The project was manufactured, delivered and installed within 4 weeks of ordering.